This multi-purpose sports hall by Parisian studio AP 5 Architects has shutters in the facade to open the lower part of the building.
Called La Halle du Robin, the top part of the rectangular building is clad in larch batons, with the exception of one side, which is clad in wood and clear polycarbonate panels.
The lower portion is made up of Corten steel panels, 9 of which can be opened up and secured by steel cables.
The architects intend the appearance of the building to change over time, with the steel turning a deep red colour and the wood darkening with age.
Photographs are © T. Guyenet unless otherwise stated.
More buildings for sports on Dezeen »
More architecture on Dezeen »
The following information is from the architects:
LA HALLE DU ROBIN
Robin Sports Center Hall
Transform the box according to events or seasons. River running in the valley of the Plaine near the town center.
Next to the various buildings, the shape of the frame is based on the lean-to and utilitarian buildings in the vicinity. The roof inclination of the Sports Center is the same as the nearby petanque club’s forming a harmonious whole.
The roofing is of an average height of 4,5 meter. It is supported by a white lacquered steel frame covered with thin strips glued together. A large wooden cantilever portico is maintained by small metallic poles on the other three sides.
A waterproof layer made of steel tanks on the roof and of polycarbonate and larch sheets over the entire upper part of the building.
The façade is covered with wooden lath to shield it from wind and sun. The lower part of the structure is in corten steel sheets over a steel frame closing the building.
The equipment can be moved around from a room to the open space based on needs and seasons. When it is cold the building is shut when there are large events or in warm periods, 9 front panels are opened so as to allow free circulation and open view on the scenery.
This open space configuration makes it easy to see the river and to open up indoor activities outside. The doors are opened and kept open by gas spring struts and secured with a stainless steel cable.
A large sliding door is the final part of the existing building that allows a wide opening of the building on the outside during events.
The simple shape of the building changes with the moveable façades, the materials change appearance and the facing adapting to orientation all changing with the seasons.
The wood and the metal sheets are all from local origin. The gradual evolution of those perishable materials will change the outside aspect of the whole building.
Above photograph is courtesy of the architects
The wood will turn gray and the metal sheets orange. The façades will bear the mark of time.
Above photograph is courtesy of the architects
Materials
Frame: glued strips, galavanized steel + rustproof white paint
Siding: corten steel sheets, polycarbonate and larch panels
Intervenants
– AP 5, Architect and landscaping agency
Architect: Stéphane Lemoine,
Architect collaborator: Toshiharu Kudo
– Team AP 5 with bet 2C (structure, economist), Ouest coordination (construction site)
Click for larger image
– Contractors Section 1: Grennevo, shell / Section 2: Haas Weissrock, structure / Section 3, roofing / Section 4: Mellé, locksmithery /
Click for larger image
Site: Raon l’Etape (department 88)
Program: Space for multiple purposes: Sports training center hall
Click for larger image
Size: 300m2 (3229 sq ft)
Client: Township association of the Vallée de la Plaine
Type of mission: full mission conception and build
Click for larger image
Architect: AP5 architects
Cost: 0.3 million euros
Year: 2010
See also:
.
Sports centre by Batlle i Roig Arquitectes | Football Training Centre Soweto by RUFproject | Prefabricated Nature by MYCC |
Post a Comment